UCTEIPSUPS UCTEIPSUPS Home  |  Contact  |  Masthead  |  Newsletter   
  Download Area

UCTEIPSUPS

Download Area

About the Project

Von Wladiwostok bis Lissabon; energiespektrum 5/2008
PDF-Dokument | 313 KByte

The Feasibility of Synchronous Interconnection between IPS/UPS and UCTE, 26. October 2007
PDF-Dokument | 701 KByte

Project Status Summary December 2006
PDF-Dokument | 60 KByte

Connecting East and West, Dr. Matthias Luther, Reprint from Power Engineering International, October 2006
PDF-Dokument | 154 KByte

Project Profile June 2005
PDF-Dokument | 173 KByte

Project Description at the Kick-Off Meeting, Dr. Matthias Luther - Project Manager UCTE-IPSUPS Study, April 2005
PDF-Dokument | 3.130 KByte

Kick-off meeting of the Feasibility Study: “Synchronous Interconnection of the Power Systems of IPS/UPS with UCTE”
EC Keynote speech of Mr. Schmitt von Sydow , April 2005
PDF-Dokument | 20 KByte

Kick-off meeting of the Feasibility Study: “IPS/UPS Overview"
Sergei Lebed – System Operator – Central Dispatching Office for UES (Russia), April 2005

PDF-Dokument | 20 KByte

Technical Papers

Comparison of the results of full-scale experiment and long term dynamics simulation in the Siberian Interconnected Power System
PDF-Dokument | 982 KByte

Dynamic properties of bulk power interconnections
PDF-Dokument | 883 KByte

Simulation of the dynamic system security as  a prerequisite e for the extension of interconnected systems
PDF-Dokument | 917 KByte

Entwicklungen zum gesamteuropäischen Stromverbund
PDF-Dokument | 1.279 KByte

Stability studies concerning the integration of CENTREL network into the power system of UCPTE
PDF-Dokument | 503 KByte

Bewertung von Drehstrom-und Gleichstromvarianten für Hochleistungs-Fernübertragungen im Großverbund
PDF-Dokument | 593 KByte

Parallel operation of CENTREL and UCPTE networks under system dynamics aspects
PDF-Dokument | 663 KByte

Stabilitätsaspekte bei Ausdehnung von Verbundnetzen
PDF-Dokument | 822 KByte

Analysis and Damping of Inter-Area Oscillations in the UCTE/CENTREL Power System
PDF-Dokument | Cigré; Session 2000, 38-113 | 809 KByte

Reliability problems in UPS of Russia regimes management in market and insufficient network transmission capacity conditions
PDF-Dokument | Cigré; Session 2002, 39-302 | 371 KByte

Dynamic System Studies of new Requirements and Strategies for the Primary Control in the UCPTE/CENTREL Power System
PDF-Dokument | Cigré; Session 1998, 39-106 | 293 KByte

Reliable electricity system and requested extensions towards CIS and Baltic countries, North Africa and Middle East
PDF-Dokument | TEN-E Conference 22-23 Sept. 2004 | 3.370 KByte

Miscellaneous

Forming Electricity Markets in the Commonwealth of Independent States and its Impact upon Power System Development
PDF-Dokument | Cigré; Session 2002, 37-304 | 317 KByte

top

   
  News
 
 05.05.2008

UCTE-IPS/UPS Feasibility Study: key conclusions endorsed by study partners

 23.04.2008

UCTE-IPS/UPS Feasibility Study investigation phase completed

 22.12.2006

UCTE-IPS/UPS Feasibility Study: Important Milestones reached in December 2006

 16.11.2005

Leading associations and stakeholders met in Brussels.